Longer reads behind the calculator bands. Every figure is a planning range — not a quote from a contractor.

Latest news: Planning fees from 8 December 2026: £548 to £575 for a householder application (6 Nov 2026) · All news

Start here: suggested reading order

  1. Region and access — how the calculator’s factors move any band.
  2. Cost per square metre — what a £/m² rate includes, and what it leaves out.
  3. Your project guide: loft conversion, extension £ per m² or boiler, heat pump and PV (and boiler vs heat pump if you are choosing between them).
  4. VAT on home works — which rate is likely to apply before you compare quotes.
  5. Then run the calculator and read the methodology.

How to use the ranges

Start with the calculator for a quick planning band, then use the relevant guide to understand what is driving it. A mid figure is a band, not a quote: the same headline project can move materially with structure, finishes, services and site constraints. Use the result to frame questions and compare written quotes based on the same scope, rather than treating it as a promise of what a contractor will charge.

These pages are deliberately practical rather than a specification or design service. They explain the assumptions behind the model, point out common omissions and show where a simple input can hide a complicated job. For examples of how different scopes sit alongside each other, browse the project catalogue as well as the topic guides below.

What each guide covers

Loft conversion cost UK. A basic Velux conversion usually preserves the roof shape, while a dormer adds usable headroom and changes the structural and external package. Hip-to-gable, L-shaped and mansard schemes can involve more roof rebuilding, steels, stairs, fire upgrades and finishes. The form matters more than calling every job a “loft conversion”, so compare like with like — and use the worked rear-dormer example before you collect quotes.

Why extension £/m² is blunt. Floor area is useful for a first pass, but it does not price kitchens, bathrooms, glazing, foundations, drainage, steels or tricky junctions. A compact, highly serviced room can cost more per m² than a larger simple shell. The guide explains how to use an area band without mistaking it for a tender.

Boiler, heat pump and PV. These are different packages, not interchangeable labels. A like-for-like boiler replacement may focus on plant and fluework; an air-source heat pump can require emitters, controls and external space; PV is a roof, inverter and electrical installation. Compare the scope, capacity and enabling work before comparing totals.

Boiler vs heat pump. A head-to-head for a gas-heated home: the calculator’s upfront bands for a combi swap, a system boiler and an air-source heat pump, a worked example after the Boiler Upgrade Scheme grant, how VAT differs, the arithmetic behind running costs at the current price cap, and the suitability checks — insulation, radiators, space, hot water, noise and permitted development.

VAT on home works. Most work on an existing home is 20%. Installing qualifying energy-saving materials such as heat pumps, solar panels and insulation is 0% until 31 March 2027, then 5%. New dwellings and some conversions have their own rules. The calculator’s VAT control shows a band at your chosen rate; confirm the rate on the quote.

Cost per square metre. A rate per m² is the quickest sense-check on an area-based job, and the easiest to misread. The guide lists the calculator’s own £/m² bands for every area-priced project, then shows how fixed costs, small sizes, specification, region, VAT and contingency move a 20 m² extension from a £2,650 headline rate to about £4,600 per m² all-in. It also covers the jobs — kitchens, windows, boilers — where floor area is the wrong unit.

Region and access uplifts. Labour markets and overheads vary around the UK, while parking, scaffolding, skips, crane access, long carries and restricted terraces can add cost anywhere. A regional factor is a planning adjustment, not a postcode price book. Record access constraints early and ask quotes to state what is included.