CATALOGUE

Projects in this lab

Compiled September 2026 mid points before spec, region, VAT and contingency. Open a row to run it with your size and extras. Not a price book for a postcode — and not a quote.

Not a quote. Figures on this page are illustrative UK cost bands for planning. They are not a tender, valuation or building-regulation ruling. Get written quotes for the property. Project Cost Lab (Rodway Labs) is not a contractor, architect or quantity surveyor. The mid figure is a band, not a price; the VAT toggle is a display choice, not a ruling.

Project How it scales Default size Compiled mid before factors

Whole-job items show a lump mid. Area, run and unit items show mid × default quantity. Treat every figure as a planning band.